[23:36:56] 10Phabricator (Upstream), 10Release-Engineering-Team (Doing 😎), 07Upstream: Option to measure WIP limits based on card count instead of points, to more closely adhere to Kanban standards. - https://phabricator.wikimedia.org/T120042#10916220 (10Aklapper)